the Olympics, the Giro d’italia, the football world Cup and the French Open are moved. Wimbledon and the Tour de France, but more firmly to your appointment in the summer. For how long? 27. June, the France to start the tour in nice. But no one believes.
That the health is in the foreground, is clear to all. But organizers ASO have in the case of a Tour cancellation is yet another issue. According to IMAGE-information, that would mean for the family business, Amaury 200 million Euro loss. The Cycling is at risk of collapse!
crowds in the Alps and the Pyrenees, these images will. this year the Tour de France is probably the not photo: Christophe Ena / AP Photo / dpa
Paris-Roubaix and liège-Bastogne type-liège-Corona fall victim to, but have been postponed for the time being only Both of these are ASO-race. The Nachholer, as well as the Vuelta, the tour of Spain and Tour of Germany – should they take place because – can’t plug the financial hole that rips the Tour.
bike-Pro Roger Kluge (34) to IMAGE: “A round trip to cancel is sure easier than Olympia with 11 000 participants. I would still have to wait how the situation develops. We train all of me it would be enough if two weeks before the Tour comes to a rejection.“