https://news.rambler.ru/img/2020/05/15/100513.054687.2411.jpeg

They will appear in the construction of multi-level transport interchanges.

In the area of Nizhny Novgorod in the construction of multilevel interchanges will make the two ramps and the underpass. Project documentation has been agreed with Moskomekspertiza.

Transportation across the tracks of Kursk direction of the Moscow railway will connect the Ryazansky Prospekt and the Third transport ring with the adjacent streets.

“under the main construction works will be finished the construction of roads and two underground pedestrian crossings, installation of noise barriers, relocation of rainwater and household sewage, installation of outdoor lighting networks and communications, as well as landscaping,” — said the Chairman of Moskomekspertizu Valery Leonov.

The Minister said that the length of the first underpass will be 20 meters, it will cross the right-hand exit from Nizhny Novgorod street near the house 102б, structure 1. The second transition appears near the house 102 in Nizhny Novgorod street and will run along the projected travel.

Under the project, new roads will be equipped with intelligent transport system for automated traffic control. Experts will install rotary camera high-resolution, as well as information boards with the IP camera.

In addition, in this area there will be three noise-reducing screen a total length of 220 meters, and in homes that are nearby, I put soundproof Windows. The adjacent territory will be landscaped: here will break lawns, planting trees and bushes, make hedges, lay out flower beds with perennial and ornamental grass.