https://cdnimg.rg.ru/img/content/187/32/14/IMG_2104_d_850.jpg

Simferopol Authorities intend to continue the reconstruction of the embankment along the river Salgir. This at a press conference in the multimedia press center MIA “Russia today” said head of Simferopol administration Elena Protsenko.

In the framework of the project it is planned to arrange well the territory of the hotel “Moscow” to the Yalta bypass road, and also to carry out repairs and landscaping on the site from a cinema “Space” to Evpatoria highway. Also on this site is supposed to clean the riverbed.

– On the improvement of hotel “Moscow” in the direction of the bypass provided 24 million rubles, and the cleaning of the riverbed, as well as repairs and improvement of the embankment on the stretch from the Kosmos cinema to the highway Evpatoria – about 300 million rubles.

However, Protsenko refused to give a timeframe for the start of work, citing the fact that the city authorities had to reallocate budget funds to support small and medium businesses because of the situation with the spread of coronavirus infection.

– But estimates and preliminary designs have, she concluded.

last year in Simferopol conducted a reconstruction of the greater part of the embankment of Salgir length of 14 kilometers. Under the contract in the amount of 498,3 million rubles contractor cleared the riverbed, laid granite and paving slabs, installed curbs and curbs lost iron railings, conducted the installation of outdoor lighting and led lamps, established small architectural forms.

this year along the Salgir planned to plant 100 large trees in accordance with dendroplan, as well as set on the waterfront where street furniture.

Earlier in the mayor’s office announced plans to continue the waterfront all over within the boundaries of Simferopol and said that the contractor for reconstruction in the next step choose the results of the new tender procedures.