In the area of Sheremetyevo on the street adjusted the Aircraft traffic pattern. About it reported in a press-service of the Ministry of transport and road infrastructure of the Moscow region.
"August 14, in connection with the reconstruction of the road in the area of terminals B and C of Sheremetyevo airport, the adjusted scheme of movement of motor transport along the street Aviation", – said the Agency.
At the time of the changes, the fare will only be open for two lanes. On other roads it is planned to replace the road surface and to upgrade the utilities.
Work on the reconstruction of the Aviation streets will be completed by the end of 2020.
Earlier it became known that on August 16 will be closed to traffic in the area, Smolensk street. Restrictions to impose for the period of filming.