https://cdnimg.rg.ru/img/content/193/01/91/651360389947.7568_d_850.jpg

the Plane is already assembled, the aircraft undergoes ground tests, preparing for the first flight, – said the head of the KLA. – I think in September, according to our plans, we this car will raise in Moscow in Zhukovsky.

According to him, in parallel with the preparation for the first flight pass bench testing, ground testing, preparation of the training complex and after-sales service system.

the Plane is designed for 68 passengers, the machine speed is 500 km/h, the source said the President.

– the Machine is extremely popular, the machine is very needed, just in remote regions, – said Slusar. – We are planning in addition to the civil version to do another version for our spezzacatena. It is also very important, because it changes one of those planes that now, “Ilyushin”, the old.

the reporter also said that the aircraft is all weather, can use unpaved runways. At the aircraft factory in Lukhovitsy, it is planned to produce up to 12 aircraft a year.

the Il-114-300 was developed in the eighties of the last century, in Uzbekistan there were about 20 cars. The launch of a series of aircraft scheduled for 2023.