it is at this region, according to the oilman, the last two years the company has focused its main attention and got a good result. “In January it was the opening of the South block Karaskovo field. Today we can talk about the achievements that we have received two new structures”, he added.
West Moskovichevskoe well Ispanskogo deposits as a result of drilling commercial oil flow was obtained at a depth of over four thousand meters. At the moment, well done drilling down production casing. “In the middle of next month we will introduce it into operation,” said Povich.
And on well No. 2 in North Malkowskiego deposits the flow of oil amounted to 50 tons per day. Head of drilling operations Victor Archipenko told reporters that the well has a bottom 2954 meters. “She is drilled with 6 APR with haste in 25 days. Commercial drilling speed of the project is 1118 meters per month, but in fact, we have been conducting exploration in two times faster. Used modern tool, pumping equipment, sewage treatment system,” he explained.
Laboratory studies have shown that obtained from the new oil fields excellent technological characteristics: it’s light, low-sulfur, low-viscosity, has a high yield of light fractions.
by the Way, in this region, according to Pavica, in the next three years the company plans to drill another ten exploration wells. And all in the country at the moment, 79 fields, 61 in development, nearly 900 wells, BelTA informs.